Darmadi, Ir. Darmadi, MM, MT (2019) PERBANDINGAN BIAYA DESAIN PERKERASAN ASPAL DENGAN UMUR RENCANA PADA PROYEK JALAN BATAS KOTA CILEGON-CIBALIUNG DAN CITEREUP-TANJUNG LESUNG. Jurnal Teknik Sipil - Arsitektur, 18 (2). pp. 54-61. ISSN 1412-9299
Text
PERBANDINGAN BIAYA DESAIN PERKERASAN ASPAL DENGAN UMUR RENCANAPADA PROYEK JALAN BATAS KOTA CILEGON-CIBALIUNG DAN CITEREUP-TANJUNG LESUNG.pdf Download (626kB) |
Abstract
Roads are an important infrastructure in supporting economic development in an area. Goodquality is prioritized for the safety and comfort of road users. Improvement of the Beru –CinandangRoad Section (STA 0 + 000 - 9 + 410), Pandegelang Regency consists of pavement thickness, andcalculation of the budget plan.The methods used include Road Pavement Design Manual Number 02 / M / BM / 2013 andcalculating the Cost Budget Plan using the Analysis of Work Unit Price (AHSP) for the Public WorksBalitbang 2012 Public Works, from each of the pavement thickness planning results. The researchdata used include primary and secondary data from the Cilegon-Cibaliung City and Citereup-TanjungLesung Boundary Road Reconstruction projectThe results of this study are road pavement planning with a road body width of 7 m, planningpavement thickness with Laston and Asbuton with Laston Layer 4 cm thick, Laston layer between AC-BC 6 cm thick, Laston AC Base base layer 16 thick with top foundation in the form of stone broke theclass A 30 cm along with the bottom foundation of the selected heap with a thickness of 30 cm andcalculated the Comparison of the Budget Plan for 20,989,956,000.
Item Type: | Article |
---|---|
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik Sipil dan Perencanaan > S1-Teknik Sipil |
Depositing User: | Mrs irene rene |
Date Deposited: | 12 Oct 2020 12:21 |
Last Modified: | 20 Oct 2020 07:04 |
URI: | http://repo.jayabaya.ac.id/id/eprint/32 |
Actions (login required)
View Item |